Dental chair installation for UK practices, from the floor box to the first patient: water, compressed air, suction, drainage and power connected in line with the manufacturer's installation manual, then calibrated and handed over to your team. We fit new treatment centres in new surgeries and replace chairs in working practices, with the backflow protection UK water rules require. We are authorised and factory-trained for Anthos and Dentsply Sirona treatment centres.

Engineer Erion Çollaku setting up a new dental treatment unit
What We Do

Dental Chair Installation Work

Every service a new treatment centre needs, done in the order the manufacturer specifies and signed off on a commissioning sheet.

01

Positioning and Mounting

We check the floor box or service console position against the chair's template before anything is fixed, set the chair base on a level, load-bearing floor and anchor it where the manufacturer requires. Operator side, assistant arm swing and light position are agreed with the dentist first, so the surgery suits four-handed working rather than the installer's convenience.

02

Water, Air, Suction and Power

Dental units are a fluid Category 5 risk under the Water Supply (Water Fittings) Regulations 1999, so the water feed needs an air gap or a unit with built-in Category 5 protection. We connect compressed air at the pressure on the unit's data plate, run suction and drain with a continuous fall, and land power on a dedicated circuit installed and certified to BS 7671 by a qualified electrician.

03

Set-Up and Calibration

Spray water and air set on each instrument line, turbine and motor drive pressures adjusted to specification, foot control response tuned and chair travel limits programmed. Values are recorded so the next service engineer starts from known settings.

04

Commissioning and Handover

Safety stops, foot control, operating light, scaler, suction and every instrument are tested under load. You receive a commissioning record and the manufacturer documentation, and your team is shown waterline disinfection, daily start-up and shut-down, and the checks HTM 01-05 expects.

See it in action

From our portfolio

How this same expertise plays out on a real dental clinic project.

Klinike Dentare 2K
Full Dental Clinic Design & Installation

Klinike Dentare 2K

  • Tiranë, Albania
  • 200 m²
  • 2025
View project
From the Blog

From the blog

Recent articles on dental practice design, equipment and patient flow.

Quick Contact

Want to talk directly? Message us on WhatsApp.

Chat on WhatsApp

+355 69 654 5873

Dental Chair Installation for UK Practices | Collaku